论文部分内容阅读
现今绿化工程中用竹十分广泛,数量亦大。为了提高观赏竹移植的成活率,这里将笔者于1998年在石门公园采用的“打孔注液全冠移竹”小技法献给大家,当时70丛竹成活率100%。移竹时间为7月中旬,取竹前一天下了阵雨。我采用的是3~5杆/丛或5~7杆/丛裸蔸整体移植的方法。挖取、运输、定位、培土、浇足定根水等,都按常规进行,所不同的是,我对所栽竹丛的每枝竹杆,都在离地(近竹蔸处)1.6~2米高、上方竹节以下5厘米处,用直径2
Today’s greening project with a very wide range of bamboo, the number is also large. In order to improve the survival rate of ornamental bamboo transplantation, here I will be used in Shimen Park in 1998, “perforated injection of bamboo crown ” small skills to you, 70 bamboo survival rate of 100%. Move bamboo time in mid-July, take the bamboo shower the day before. I use the 3 ~ 5 rod / plexus or 5 ~ 7 rod / plexus naked transplantation as a whole. Digging, transportation, positioning, earthing, pouring foot root water, etc., are carried out according to conventional, the difference is that I planted bamboo branches of each bamboo pole, are in the ground (near Penny Department) 1.6 ~ 2 meters high, below the bamboo 5 cm below, with a diameter of 2