论文部分内容阅读
水利电力部、广东省水利电力厅于1961年三月份联合组成工作组,在汕头专署水利电力局及当地县委的配合下,曾对汕头地区六个大、中型水库(其中三个大型、三个中型)的安全渡汛问题进行了检查。这是检查组写的一篇检查报告。1961年汛期目前虽已过去,从写报告到现在经过的时间虽也较长,但是这篇报告中所反映出工程上存在的问题,对今后各地区安全渡汛和更合理地进行工程规划、设计工作,仍有重要意义。因此特摘要刊登,供参考。
In March 1961, the Ministry of Water Conservancy and Electricity and Guangdong Provincial Bureau of Water Conservancy and Electricity jointly formed a working group. In cooperation with the Shantou Hydropower and Water Resources Bureau and local county committees, six large and medium-sized reservoirs in Shantou (including three large and three Medium-sized) security crossing floods were examined. This is an inspection report written by the inspection team. Although the flood season in 1961 is over now, the time from writing the report to the present time is long. However, this report reflects the existing problems in the project and provides a plan for safe flood diversion and more reasonable project planning in various regions in the future. Design work is still significant. So special summary published for reference.