论文部分内容阅读
东北重型机械学院与国家科委签订的《300毫米四辊轧机液压弯辊及板彤控制》科研合同项目,已按合同要求完成了各项试验研究任务,取得了满意的结果。于1982年9月15~19日在东北重型机械学院召开了技术鉴定会。会议由机械工业部重型矿山机械总局主持,来自全国各地三十七个工厂、科研单位、高等院校的六十七名代表参加了会议。与会代表听取了东北重型机械学院《液压弯辊及板形控制》课题组的同志们所作的专题报告,观看了试验表演,
Northeast Heavy Machinery Institute and the State Science Commission signed the “300 mm four-roll mill hydraulic bending roll and plate Tong control” research contract projects, the contract has been completed according to the requirements of the pilot study and achieved satisfactory results. In 1982 September 15 ~ 19 at the Northeast Heavy Machinery Institute held a technical appraisal. The meeting was chaired by the General Administration of Heavy Mining Machinery of the Ministry of Machinery Industry. Sixty-seven representatives from 37 factories, research institutes and institutions of higher learning all over the country attended the conference. The delegates listened to the special report made by comrades from the “Hydraulic Bending and Shaping Control” group of the Northeast Heavy Machinery Institute, and watched the experimental performances,