一、项目的提出 伊图里河发电所是全路装机容量较大的发电所。有柴油发电机组四台,计1840kVA,长期补峰发电,最大日耗油量6吨。因受建筑位置限制,多年未能修建柴油贮存库,致使柴油贮存方式长期不符合国家防火标准的有关规定。 由于伊图里河机务段牵引动力的内燃化,根据铁道部《铁路工程技术规范》第9—16条之规定,发电所做为机务段的毗邻,修建输油管路与机务段共用贮油罐,由
I. Project Proposal The Ituri River Power Station is a large power generation plant with a large installed capacity. There are four diesel generator sets, total 1840kVA, long-term fill peak generation, the maximum daily fuel consumption of 6 tons. Due to the restriction of the construction location, the diesel storage tank has not been built for many years, resulting in the long-term failure of the diesel oil storage system to meet the relevant provisions of the national fire safety standards. Due to the internal combustion of the traction power of the Ituri River locomotive depot, according to the provisions of Article 9-16 of the “Technical Specifications for Railway Engineering” issued by the Ministry of Railways, the generator station is adjacent to the locomotive depot and the oil storage pipeline is shared with the locomotive depot. by