平凉南站位于正在建设中的宝中线上,作业量较大。按现行设计作业集中在车站一端,各项建设速度与宝中线建设速度不同步,今后附近还将建设平凉北区段站。为此,本文建议地方铁路从车站另一端引入,内燃、电力与蒸汽两套机车折返设备合并,设在站对左位置,并将本站一次建成区段站。此外,对站线、专用线和车辆检修设施也提出了建议。这样,可节省投资,方便作业。
Pingliang South Station is located in Baozhong line under construction, large amount of work. According to the current design work is concentrated at one end of the station, the speed of construction and Po central line construction speed is not synchronized, the future will be building near Pingliang North Section. Therefore, this paper proposes that the local railways should be introduced from the other end of the station. The internal combustion, electric power and steam locomotives should be combined with the turning-back equipment of locomotives. The station should be set at the left position and the station should be built into a section at a time. In addition, the station line, special lines and vehicle maintenance facilities also made recommendations. In this way, it can save investment and facilitate homework.