位于邢台地区沙河县境内的显德汪煤矿,已于1982年11月10日正式移交投产。 这对设计年产量为90万吨的大型矿井,由河北煤炭四处承建。其建设特点是:速度快、质量好、工期短、投资省。 矿井于1976年12月15日在毫无施工准备的情况下,用铁锹、铁镐土法开工,于1982年9月建成,建设工期,包括准备工作1年在内,共5年9个半月,与国内同类型矿井比较,工期缩1至2年。 矿井实际总投资(包括15.9公里铁路及车站扩建)9,000多万元,比近年来国家同类型矿井节约投资约20%以上。 投产前累计完成井巷工程23,742.6米,为设计要求投产前应完工程量22,691
Located in Shahe County, Xingtai region Hindewang coal mine, was November 10, 1982 formally put into operation. This design for the annual output of 900,000 tons of large-scale coal mines, surrounded by coal construction in Hebei. Its construction features are: fast, good quality, short construction period, investment in the province. On December 15, 1976, the mine was started with shovels and pickaxe earthworks with no construction preparation and was completed in September 1982 with a construction period of one year, including one year of preparation, for a total of five and a half years , Compared with the same type of mine in the country, duration reduced by 1 to 2 years. The actual total investment in mines (including the expansion of 15.9 km of railways and stations) exceeded 90 million yuan, saving about 20% more than the same type of mines in the country in recent years. Before completion of the project, a total of 23,742.6 meters of well and laneway engineering have been completed, and the design volume should be completed before the project is put into operation. 22,691