论文部分内容阅读
为了加速鋁工业的发展,适应国民經济的需要,我们除了对鋁生产主要設备电解槽做了一系列的簡化試驗外,还必須对配合鋁生产的輔助生产車間的設备与生产流程同时加以簡化試驗。阳极糊在鋁生产过程中消耗量是很大的,每吨鋁就需阳极糊500—600公斤。在阳极糊制造过程中焦炭材料都必須經过一个很主要的工序高溫鍛燒,而鍛燒是在一个具有硅石砖,粘土磚等的結构复杂的锻燒爐中进行的。鍛燒爐所使用的材料重量达1815吨,構成这样的爐子所需之異形磚就达百余种之多,結構复杂施工的要求也高,投資
In order to speed up the development of the aluminum industry and adapt to the needs of the national economy, we have also conducted a series of simplified tests on the electrolyzer for the main equipment for aluminum production. In addition, we must also make the equipment and production processes of the auxiliary production plant with aluminum production simultaneously Simplify the test. Anode paste consumption in the aluminum production process is very large, per ton of aluminum anode paste to be 500-600 kg. During the manufacture of anode paste, the coke material must be calcined at a very high temperature in a very important process. The calcination is carried out in a complex calciner with silica bricks, clay bricks and the like. The weight of the materials used in the calcining furnace amounts to 1815 tons. As many as 100 kinds of special-shaped bricks are required to form such a furnace, the requirements for complicated structures are also high, and the investment