论文部分内容阅读
提出用POA算法解决水电站机组间有功功率最优分配问题,实例研究表明:该方法具有计算速度快、精度高、直接使用效率特性曲线等优点,可用于实时在线控制。
The POA algorithm is proposed to solve the optimal distribution of active power between hydropower stations. The case study shows that this method has the advantages of fast calculation, high precision and direct use of efficiency curves, which can be used for real-time on-line control.