论文部分内容阅读
结合西安中医研究所门诊楼工程(八层,高32米),拟采用升板法施工。为了搞好这一工作,在省建工局领导下,有省第二设计院、中医研究所、省机械施工公司、省第十工程公司、建工局研究所、西安冶金建筑学院等单位参加组成以工人为主体的三结合研究小组。
In combination with the outpatient building project of Xi’an Traditional Chinese Medicine Research Institute (eight stories, 32 meters high), it is proposed to use the riser method. In order to do a good job in this work, under the leadership of the Provincial Construction and Industry Bureau, there are the second design institute of the province, the Institute of Traditional Chinese Medicine, the Provincial Machinery Construction Company, the Provincial Tenth Engineering Company, the Institute of Construction Industry Bureau, Xi’an Metallurgical Architecture College and other units A three-combination research group consisting of workers as the main body.