论文部分内容阅读
在毛主席革命路线和华主席抓纲治国战略决策的指引下,我矿革命职工高举“鞍钢宪法”的旗帜,深入开展工业学大庆运动。自力更生,艰苦奋斗,在各级党委的关怀下,在云南省电力设计院的大力帮助下,我们把一台40年代的ДКВ_(10)-13/350型低压10吨锅炉改造成为15吨/时的全沸腾燃烧机械化锅炉。于1976年11月6日正式投产,经一年多的运行,证明改造是成功的。改造后,机械化程度有了较大的提高,减轻了工人的劳动强度,操作工人可以集中于控制室里操作;锅炉出力由原来的8.9吨/时提高到15吨/时;锅炉热效率由50%提高到89%;
Under the guidance of Chairman Mao’s revolutionary line and Chairman Hua’s strategic plan of running the country with the rule of principle, mine workers held high the banner of “Ansteel’s Constitution” and deepened the Daqing Industrialization Movement. Self-reliance and arduous struggle. With the great help of Yunnan Provincial Electric Power Design Institute under the care of party committees at all levels, we transformed a 40-ton low-pressure 10 ton boiler of ДКВ_ (10) -13/350 into a 15 tonne / hour Full boiling combustion mechanized boiler. On November 6, 1976 formally put into operation, after more than a year of operation, proved that the transformation is successful. After the transformation, the degree of mechanization has been greatly improved, reducing the labor intensity of workers, workers can be concentrated in the control room operation; boiler output from the original 8.9 tons / h to 15 tons / h; boiler thermal efficiency from 50% Increase to 89%;