三峡工程建设方式 作为世界上最大工程——三峡工程,将采取“一级开发、一次建成、分期蓄水、连续移民”的方案。一级开发,是指从三峡坝址到重庆之间的长江干流上只修建三峡一级枢纽工程;一次建成,指工程按合理工期一次连续修完;分期蓄水,指水库建成后不是一次就蓄水到正常水位175m,而是先蓄水到156m,再逐步提高,以缓解移民难度;连续移民,即移民不分期,实行连续搬迁。
The construction method of the Three Gorges Project As the world’s largest project, the Three Gorges Project, will adopt the “first-class development, one-time completion, phased water storage, continuous immigration” program. The first-level development refers to the construction of the first-tier hub of the Three Gorges Project from the Three Gorges Dam site to the mainstream of the Yangtze River between Chongqing. Once completed, it means that the project will be completed at one time with a reasonable construction period; water will be stored in phases, which means that once the reservoir is built, it is not once. The impoundment to the normal water level of 175m, but the first impoundment to 156m, and then gradually increase to ease the difficulty of immigration; continuous immigration, that is, immigrants without phases, the implementation of continuous relocation.